TM 55-1925-284-14&P
0017 00
5. Position the belt guard (figure 1, item 4) over the studs (figure 1, item 3) on its base (figure 1, item 5) and
secure it with the four nuts (figure 1, item 1) and four new lockwashers (figure 1, item 2).
6. Perform the Follow-On Service procedure at the end of this work package.
FOLLOW-ON SERVICE
1. Remove the lockouts and tagouts (FM 55-502).
3. Check the blower for proper operation.
4. Return the equipment to the desired readiness condition.
END OF WORK PACKAGE
0017 017506 -5lank
0 0- / 0 b