TM 55-1930-208-10
(5) Install blanket assemblies (10 thru 13) and secure with wire (9) (item 15, Appendix D). Cover blanket
assembly (10) with insulation blanket (item 13, Appendix D) and apply a coat of mastic polyvinyl (item 14,
(6) Install a new gasket (8) between muffler (12) and pipe (7). Install pipe (7) and secure with eight screws (6),
(7) Install U-bolt (3) and secure with two lockwashers (2) and two nuts (1).
Figure 3-5. Muffler and Pipes, Removal/Installation.
3-21