CHAPTER 1 INTRODUCTIONREPORTING EQUIPMENT IMPROVEMENT RECOMMENDATIONS (EIR).SECTION II. EQUIPMENT DESCRIPTION AND DATA - TM-55-1930-208-100009LOCATION AND DESCRIPTION OF MAJOR COMPONENTS - TM-55-1930-208-100010Figure 1-2. Location and Description of Major Components.Figure 1-3. Cargo Piping System.Figure 1-4. Engine, Speed ReducerEQUIPMENT DATA - TM-55-1930-208-100014Tabulated Data. - TM-55-1930-208-100015EQUIPMENT DATA - Continued.SECTION III. TECHNICAL PRINCIPLES OF OPERATION - TM-55-1930-208-100017PRECAUTIONS IN OPERATIONS.CHAPTER 2 OPERATING INSTRUCTIONS - TM-55-1930-208-100019Table 2-1. Engine Controls and indicatorsTable 2-2. Cargo Control ValvesTable 2-3. Cargo Pressure GageSECTION II. PREVENTIVE MAINTENANCE CHECKS AND SERVICES (PMCS) - TM-55-1930-208-100023OPERATOR/CREW PMCS PROCEDURESTable 2-4. Operator/Crew Preventive Maintenance Checks and Services (PMCSTable 2-4. Operator/Crew Preventive Maintenance Checks and Services (PMCS- Continued - TM-55-1930-208-100026Table 2-4. Operator/Crew Preventive Maintenance Checks and Services (PMCS- Continued - TM-55-1930-208-100027Table 2-4. Operator/Crew Preventive Maintenance Checks and Services (PMCS- Continued - TM-55-1930-208-100028Table 2-4. Operator/Crew Preventive Maintenance Checks and Services (PMCS- Continued - TM-55-1930-208-100029Table 2-4. Operator/Crew Preventive Maintenance Checks and Services (PMCS- Continued - TM-55-1930-208-100030Table 2-4. Operator/Crew Preventive Maintenance Checks and Services (PMCS- Continued - TM-55-1930-208-100031SECTION III. OPERATION UNDER USUAL CONDITIONS - TM-55-1930-208-100032Figure 2-4. Loading Connections and Valves.DURING LOADING.AFTER LOADING.PREPARATION TO UNLOAD.Figure 2-5. Engine Starting Controls. PREPARATION TO UNLOADPREPARATION TO UNLOAD - Continued. - TM-55-1930-208-100039PREPARATION TO UNLOAD - Continued. - TM-55-1930-208-100040AFTER UNLOADING.PRECAUTION ON ENTERING CARGO TANKS.OPERATION OF ACCESSORY EQUIPMENT.Figure 2-8. Retracting Anchor.SECTION IV. OPERATION UNDER UNUSUAL CONDITIONS - TM-55-1930-208-100045Table 2-5. Guide for Preparation of Antifreeze SolutionFigure 2-9. Cold Weather Starting.CHAPTER 3 OPERATOR MAINTENANCE INSTRUCTIONS - TM-55-1930-208-100048GENERAL - TM-55-1930-208-100049SECTION II. OPERATOR/CREW TROUBLESHOOTING PROCEDURES - TM-55-1930-208-100050Table 3-1. Operator/Crew Troubleshooting - TM-55-1930-208-100051Table 3-1. Operator/Crew Troubleshooting - Continued ENGINE STOPS SUDDENLY OR STALLS FREQUENTLY. ENGINE OVERHEATS DURING OPERATION.ENGINE FAILS TO START AT TEMPERATURES ABOVE 32 (0 ).SECTION III. MAINTENANCE INSTRUCTIONS - TM-55-1930-208-100056ULLAGE ASSEMBLY MAINTENANCE Figure 3-1. Ullage Assembly Maintenance, Removal/InstallationHATCH MAINTENANCE.Figure 3-2. Hatch, Removal/Installation. FLAME SCREEN MAINTENANCE.Figure 3-3. Check Valves and Flame Screen, Removal/Installation. LADDER MAINTENANCE.Figure 3-4. Ladder Maintenance, Removal/Installation.ENGINE SHUTDOWN MAINTENANCE.MUFFLER, EXHAUST AND PIPES MAINTENANCE.MUFFLER, EXHAUST AND PIPES MAINTENANCE - Continued.Figure 3-5. Muffler and Pipes, Removal/Installation. HAND PUMP, HYDRAULIC START SYSTEM.Figure 3-6. Hydraulic Star System Hand Pump, Removal/Installation HAND PUMP, HYDRAULIC START SYSTEM. - CONTFigure 3-7. Hydraulic Start System Hand Pump. Disassembly/Reassembly.HAND PUMP, HYDRAULIC START SYSTEM- Continued. Installation - TM-55-1930-208-100074CRANKING MOTOR, HYDRAULIC START SYSTEM MAINTENANCE.Figure 3-8. Cranking Motor, Removal/Installation.HYDRAULIC PUMP.Figure 3-9. Hydraulic Pump, Removal/Installation.CONTROL VALVE MAINTENANCE.Figure 3-10. Control Valve, Removal/InstallationHYDRAULIC FILTER MAINTENANCE.Figure 3-12. Filter, Servicing and Inspection.AIR CLEANER ASSEMBLY.Figure 3-13. Air Cleaner, Removal/Installation. FUEL FILTER ASSEMBLY.Figure 3-14. Fuel Filter Assembly, Removal/Installation.FUEL STRAINER.Figure 3-15. Fuel Strainer, Removal/Installation. OIL FILTER.Figure 3-16. Oil Filter, Removal/InstallationFAN BELTS.Figure 3-17. Fan Belt Adjustment.HOSES, WATER.Figure 3-18. Radiator Hoses, Removal/InstallationWATER TEMPERATURE GAGE.Figure 3-19. Water Temperature Gage, Removal/Installation.OIL PRESSURE GAGE.Figure 3-20. Oil Pressure gage, Removal/Installation.ETHER STARTING AID.Figure 3-21. Ether Staring Aid, Removal/InstallationVALVE, RELIEF TRANSFER PUMP.Figure 3-22. Relief Valve Testing and Adjustment.LIGHTING.Figure 3-23. Lightning, Removal/InstallationLIGHTING - TM-55-1930-208-100105APPENDIX A REFERENCES - TM-55-1930-208-100106APPENDIX B COMPONENTS OF END ITEM AND BASIC ISSUE ITEMS LIST - TM-55-1930-208-100107SECTION II. COMPONENTS OF ITEM LISTSECTION III. BASIC ISSUE ITEMS - TM-55-1930-208-100109APPENDIX C ADDITIONAL AUTHORIZATION LIST (AAL) - TM-55-1930-208-100110APPENDIX D EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST - TM-55-1930-208-100111SECTION II. EXPENDABLE/DURABLE SUPPLIES AND MATERIALS LIST - TM-55-1930-208-100112TM-55-1930-208-10 Barge Liquid Cargo Non-Propelled Steel 120 Feet Design 231C NSN 1930-01-313-9472 Manual