TM 9-2320-209-10-1
1.
Rigging for dragging with derrick raised:
(a) Pull winch cable (1) out from rear winch (2). (Refer to para 4-15d.)
(b) Place winch cable (1) under and around strap sheave (3).
(c) Bring end of cable (1) forward, over and around derrick sheave (4).
(d) Raise derrick (5) to full apposition. (Refer to para4-15c.)
(e) Bring end of cable (1) around snatch sheave (6) and tie cable to end of pole (7).
GO T O FRAME 3
4-363