TM 9-2320-209-10-1
1.
Rig the winch cable (l) for derrick operation. (Refer to para 4-15f.)
2.
Make winch cable (1) fast to pole (3), slightly above balance point (4).
3.
4.
Operate rear winch (5) slowly to lift pole (3). (Refer to para 4-15d.)
Stop the winch when pole (3) is just clear of ground and in position over hole (6).
5.
GO TO FRAME 3
4-366
3? U.S. GOVERNMENT PRINTING OFFICE: 1989 643-025/80123
PIN: 046723-001