TM 9-2320-211-10-1
I
FRAME 9
WARNING
During crane operation, tell all personnel to stand clear
of crane or load. A strapped cable, or shifting or
swinging load can cause serious injury.
Never go above the crane safe load limits.
NOTE
Do not let hoist cable unwind after hook has reached load
or ground or cable coils on hoist drum will loosen.
To lift load:
1.
(a) Push HOIST control lever (1) away from operator until hook (2) is
moved down to load (3) .
(b) Secure hook (2) to load (3).
CAUTION
B e careful not to jam hoist block (4) against boom
sheaves (5) ,
(c) Pull HOIST control lever (1) toward operator to lift load (3).
2.
To lower load:
(a) Push HOIST control lever (1) away from operator to move load down
lower load (3) to the resting place.
(b) Block load (3) as needed to keep it from tipping or shifting.
(c) Take hoist hook (2) from load ( 3).
TA
053983
I
4-188