TM 9-2320-279-10-2
PMCS Tables (Cont)
Table 2-6. M984E1 Operator/Crew
Preventive Maintenance Checks and Services (Cont)
NOTE: Within designated interval, these checks are to be performed in the order listed.
B-Before Operation D-During Operation A-After Operation W-Weekly M-Monthly
Equipment is
Item to be Inspected
Interval
not ready/
Procedure: Check for and have repaired, filled,
available if:
or adjusted as needed
MATERIAL HANDLING CRANE (CONT)
Mast cylin-
(f) Move MAST control lever (20) to UP
der does
position until the mast (21) is fully
not raise
erect and the cylinders are fully ex-
completely
tended. Use BOOM control lever (17)
before stop-
UP simultaneously as required to
ping.
maintain the boom (19) at approxi-
mately 45 above horizontal until the
mast is fully erect. Hold the mast con-
trol lever to UP position for 2-3 seconds
after mast is fully erect to ensure Cyl-
inders are fully filled with oil.
2-39
Change 3