TM 9-2320-279-10-2
PMCS Tables (Cont)
Table 2-6. M984E1 Operator/Crew
Preventive Maintenance Checks and Services (Cont)
NOTE: Within designated interval. these checks are to be performed in the order listed
B-Before Operation D-During Operation A-After Operation W-Weekly M-Monthly
Interval
Item to be Inspected
Equipment is
Procedure: Check for and hove repaired, filled,
Item
not ready/
No. B D A W M
or adjusted as needed
available if:
MATERIAL HANDLING CRANE (CONT)
(12) Rotate and telescope boom.
WARNING
Keep boom cleat of all electrical lines and other
obstacles while operating crane. Serious injury or
death could result upon contact.
Be sure area is clear of personnel before moving
SWING lever. Room should be swung slow enough
so crane operator has complete control. Boom
moving out of control could cause serious injury or
death.
CAUTION
Boom must be above vehicle sides for clearance.
(a) Move SWING control lever (22) to CW position to Boom does
not turn
move boom clockwise.
clockwise.
(b) Move SWING control lever (22) to CCW position Boom does
to move boom counterclockwise.
not turn
counter-
clockwise.
2-40