TM 9-2320-279-10-2
PMCS Tables (Cont)
Table 2-6. M964E1 Operator/Crew
Preventive Maintenance Checks and Services (Cont)
NOTE: Within designated interval, these checks are to be performed in the order listed.
B-Before Operation D-During Operation A-After Operation W-Weekly M-Monthly
Item to be Inspected
Equipment is
not ready/
Procedure: Check for and have repaired, filled,
available if:
or adjusted as needed
MATERIAL HANDLING CRANE (CONT)
WARNING
Keep boom clear of all electrical lines and
Serious injury or death could result upon
contact.
CAUTION
Do not hit outrigger leg with hook block.
(e) Move BOOM control lever (17) to UP
Boom does
not raise.
position until hook (18) is 5 to 6 feet
(1.5 to 1.8 m) above left rear fender,
and boom (19) is approximately 45
above horizontal.
Change 3