TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
2-66. TOW SPADE INSTALLATION/REMOVAL (CONT).
(6) Remove two 16-ft (5 m) safety chains (7) and put safety chains in
stowage.
(7) Remove two quick pins (8) and pins (9) from tow spades (10).
(8) Install 8-ft (2.5 m) chain (11) on two towing shackles (12).
NOTE
Use pry bar to help remove tow spades.
(10) Soldier A holds left and right extension bars (13) while Soldier B
removes tow spades (10) from extension bars.
(11) Install two pins (9) and quick pins (8) in tow spades (10).
2-124