TM 9-2320-279-10-2
M984E1 General Operating Procedures (Cont)
2-67. 60-TON TACKLE BLOCK INSTALLATION/REMOVAL (M984E1).
a. Set Up 60-Ton Tackle Block.
(1) Remove handle lock (1) and lock bracket (2).
(2) Remove 8-foot (2. 5 m) chain (3) from stowage and attach chain to
60-ton tackle block (4).