TM
9-2320-279-10-2
Preparation for Transport and Operation (Cont)
E-13. EQUIPMENT BODY REMOVAL/INSTALLATION (CONT).
(25) Set PTO ENGAGE switch (16) to OFF. Indicator light (17) should go out.
(26) Shut down engine (para 2-11p).
(27) Set H.D. WINCH CONTROL switch (28) to OFF.
(28) Disconnect remote control cable (20) from receptacle (25). Install
cover (24) on receptacle.
E-8