TM 9-2320-279-10-2
Preparation for Transport and Operation (Cont).
E-13. EQUIPMENT BODY REMOVAL/INSTALLATION (CONT).
NOTE
Rotate fairlead/tensioner as required to gain access to
nuts and screws.
(31) Install pin (41) and cotter pin (42) in clevis (39).
(32) Install pivot arm (43) and pin (44).
(33) Install plate (45) with two
screws (46) and
lockwashers (47).
(34) Install shaft and block (48).
(35) Install two rollers (49).
(36) Install plate (50) with four screws (51) and nuts (52).
NOTE
Have organizational level maintenance torque screws
and nuts.
E-20