TM
9-2320-279-10-2
Preparation for Transport and Operation (Cont)
E-13. EQUIPMENT BODY REMOVAL/INSTALLATION (CONT).
(18) Remove HEAVY-DUTY WINCH REMOTE CONTROL (27) and remote
control cable (28) from stowage.
(19) Clean any dirt and water from cable ends (29) and receptacle (30).
CAUTION
Do not activate HEAVY-DUTY WINCH switch. If
activated, winch may move and cause damage to
equipment.
(20) Connect remote control cable (28) to HEAVY-DUTY WINCH REMOTE
CONTROL (27). Check that HEAVY-DUTY WINCH switch (31) is set to
OFF.
(21) Remove cover (32) from receptacle (33). Clean dirt and water from
receptacle.
(22) Connect remote control cable (28) to receptacle (33).
(23) Set POWER switch (34) to ON (LOW IDLE ONLY).
(24) Push and release LATCH switch (35) to ON.
(25) Set H.D. WINCH CONTROL switch (36) to REMOTE.
(26) Set HIGH IDLE CONTROL switch (37) to HEAVY-DUTY WINCH.
(27) Set HEAVY-DUTY WINCH switch (31) to ON.