TM 9-2320-366-10-2
2-50. WRECKER MATERIAL HANDLING CRANE (MHC)
OPERATION (CONT)
g. Raise and Lower Load.
WARNING
Area must be clear of personnel before operating swing or telescoping
boom. Boom must be rotated and telescoped slow enough so Operator
has control of load. If operator cannot see load during operation,
operate Material Handling Crane (MHC) with remote control unit.
Failure to comply may result in serious injury or death to personnel.
(1) Refer to Table 2-23. Wrecker Material Handling Crane (MHC) Range Diagram
Summary to determine correct boom angle setting.
(2) Move BOOM lever (1) to UP position until boom angle indicator (2) shows correct
boom angle as determined in step (1).
2-680