TM 9-2320-366-10-2
2-50. WRECKER MATERIAL HANDLING CRANE (MHC)
OPERATION (CONT)
CAUTION
Do not allow excessive slack to build-up when paying out cable. Failure
to comply may result in damage to equipment.
Use only a straight pull when lifting load. Failure to comply may result in
damage to equipment.
(3) Operate SWING lever (3) and TELESCOPE lever (4) to center end of boom (5)
directly over load.
(4) Operate HOIST lever (6) to reel in or pay out cable (7) and connect hook assembly
(8) to load.
(5) Install safety pin (9) in hook assembly latch (10).
2-682