TM 9-2320-366-10-2
2-50. WRECKER MATERIAL HANDLING CRANE (MHC)
OPERATION (CONT)
h. Stow MHC.
CAUTION
Boom must be positioned with outriggers and fully retracted before
lowering. Observe boom during lowering to ensure no contact is made
with tool box. Failure to comply may result in damage to equipment.
NOTE
Operate HOIST lever and TELESCOPE lever at the same time.
(1) Reel in cable (1) until approximately 2 ft (0.6 m) of cable hangs from boom (2).
(2) Move HOIST lever (3) to UP position to reel in cable (1) and TELESCOPE lever (4)
to IN position to retract boom (2).
2-684