TM 9-2320-366-10-2
3-5. CHANGING TIRE (CONT)
(20) Route other end of safety chain (23)
through flat tire (9) and connect to
spare tire retainer (20).
(21) Lower cab (para 2-28b).
e. Follow-On Maintenance.
(1) Remove wheel chocks (para 2-27h).
(2) Notify Unit Maintenance that lugnuts
need to be tightened to 425-475 lb-ft
(576-644 Nm).
(3) Notify Unit Maintenance that flat tire
needs to be repaired/replaced.
(4) Notify Unit Maintenance if flat tire was
replaced on front of vehicle that
kneeling valve must be installed.
(5) Notify Unit Maintenance that banjo
bolts need to be tightened to 22-28 lb-ft
(30-38 Nm).
End of Task.
Change 1