TM 9-2320-366-10-2
This task covers:
a. Cab Recovery
d. Load Spreader Recovery
b. Spare Tire Recovery
e. Follow-On Maintenance
c. Slide Assembly Recovery
INITIAL SETUP
Equipment Conditions
Tools and Special Tools (cont)
Vehicle parked on level ground.
Strap Assembly (Item 23 (COEI),
Engine shut down (para 2-27f).
Wheels chocked (para 2-27h).
Sling Assembly, Air Drop Roof (Item 22
Tools and Special Tools
Wrench Assembly, Speedhandle
References
FM 10-526
Wrench, Adjustable, 8 in. (Item 50,
Personnel Required
(2)
a. Cab Recovery.
WARNING
Vehicle must not be
operated until rear panel
and side panels are raised
and properly secured.
Failure to comply may
result in serious injury or
death to personnel or
damage to equipment.
NOTE
Steps (1) through (36) require
the aid of an assistant.
(1) Raise rear panel (1) and fasten five
panel latches (2).
Change 1