TM 9-2330-203-14&P
4-48.
LANDING LEG MAINTENANCE (Cont't)
e.
INSTALLATION
1.
Position landing leg (1) and retainer (4) under
frame. Extend landing leg forward and up as much
as possible until rear retainer hole Is alined with
hole in frame. Insert rearmost screw (5) from
inside and secure with new lockwasher (3) and nut
(2).
2.
Extend inner leg until holes are alined with center
and forward hole on retainer. Insert center screw
(5) from inside and secure with new lockwasher
(3) and nut (2).
3.
Insert frontward screw (5) from inside and secure
with new lockwasher (3) and nut (2).
4.
5.
6.
Lower landing leg (1) to ground and connect
7.
Remove jackstands used to support front of dolly
frame.
4-112