TM 9-2330-235-14&P
4-39. WHEEL AND TIRE MAINTENANCE.
This Task Covers:
a. Removal
c.
Installation
b. Repair
Initial Setup.
Equipment Conditions:
Tools/Test Equipment:
Trailer parked on level surface with handbrakes
General mechanic's tool kit
Common no. 1 shop set
Floor jack
Floor jack
References:
TM 9-2610-200-14
a. REMOVAL
1. Loosen six wheel stud nuts.
2. Raise wheel clear of ground.
3. Remove wheel stud nuts. Remove wheel.
b. REPAIR
Refer to TM 9-2610-200-14 for instructions on dismounting and mounting tire and tube from wheel, and for
repairing tube.
c. INSTALLATION
1. Position wheel on studs.
2. Install six wheel stud nuts and tighten fingertight.
3. Lower trailer to ground.
4. Torque six wheel stud nuts to 400-500 Ib. ft. (542-678 Norm).
4-94