TM 9-2330-246-14
4-21. 110-VOLT DOMELIGHT SWITCH AND JUNCTION BOX REPLACEMENT (M348A2H)
(Con't).
INSTALLATION
b.
1.
Install access cover (2) and junction box (14) using four screws (1).
2.
Install nut (13) on connector (3).
Install switch (7) on wall plate (8) using two screws (9), flatwashers (6), new Iockwashers (5), and nuts (4).
3.
4.
Connect wires to switch (7) and tighten screws (12). Remove tags.
Position switch (7) and wall plate (8) in junction box (14) and install four screws (11) and flatwashers (10).
5.
FOLLOW-ON TASKS:
Connect 110-volt power to semitrailer.
q
Check operation of domelights.
TA700167
4-34