TM 9-2330-246-14
4-28. CONDUIT AND FlTTlNGS REPLACEMENT (Con't).
INSTALLATION
b.
1.
Cut and bend conduit (1) as required for installation. Remove all metal shavings and sharp edges from conduit.
2.
Install nuts (5) and connectors (4) on both ends of conduit (1). Tighten nuts.
Thread wiring through conduit (1) and position conduit for installation.
3.
4.
Install connectors (4) into electrical components at both ends.
Install bondnuts (2) and nuts (3) from connectors (4) on both ends of conduit (1).
5.
Connect electrical wires to electrical components.
6.
FOLLOW-ON TASKS:
Connect intervehicular cable to semitrailer (para 2-10) or connect external power source to semitrailer.
Check operation of all circuits running through conduit that was replaced.
TA700181
4-52