TM 9-2330-246-14
4-40. ROOF HARNESS REPLACEMENT (Con't).
INSTALLATION
b.
1.
If removed, install new grommets.
Pull roof wiring harness (1) through grommets.
2.
3.
Connect wiring to all lights and switches connected to roof wiring harness (1). Refer to wiring diagrams
(para 4-52) and applicable maintenance paragraphs in
this section. Remove tags.
4.
Connect roof wiring harness (1) to branched wiring harness (2). Remove tags.
FOLLOW-ON TASKS:
Check operation of lights.
4-81