TM 9-2330-271-14&P
(7) Lower landing gear legs so that wheels
contact the ground.
(8) Remove six cotter pins, nuts, washers and
screws securing dolly assembly to the van body. Place
the attaching hardware in the stowage box.
(9) Disconnect both air hoses and the 24-volt
plug from the subbase.
CAUTION
Personnel at this point should stay clear
of the underside of the semitrailer until it
is securely resting on the K-Loader.
(10) Lift rear van body end (both sides
simultaneously) to a height permitting removal of the
dolly toward the rear. Make certain aircraft loading jacks
do not tilt. Should this occur, stop the lifting operation,
reposition jacks, and repeat the lifting operation.
(11) Pull dolly toward the rear from underneath
van body and set it aside for aircraft loading (fig. 4-3).
(12) Move the K-Loader under the van body
until it almost contacts the landing gears. Make sure that
the inner skids of the van body match the rollers of the K-
Figure 4-4. Dolly removed from van body
Figure 4-4. K-Loader supporting rear end of van body.
4-3