TM 9-2330-357-14&P
4-22. OUTRIGGER CONTROL PANEL MAINTENANCE.
This Task Covers:
a.
Outrigger Control Box Removal
h. Door Handle Installation
b.
Level Light Removal
i. Door Installation
c.
Outrigger Control Panel Removal
J. Outrigger Control Switches Installation
d.
Outrigger Control Switches Removal
k. Outrigger Control Panel Installation
e.
Door Removal
I. Level Light Installation
f.
Door Handle Removal
m. Outrigger Control Box Installation
g.
Cleaning and Inspection
Initial Setup:
Equipment Conditions:
Materials/Parts:
Slave cable disconnected from semitrailer
Tools/Test Equipment:
One preformed packing
Two cotter pins
General mechanic's tool kit
Common no. 1 shop set
Personnel Required: Two
a. OUTRIGGER CONTROL BOX REMOVAL
1.
Remove S-hook (2) from door handle (3).
2.
Remove four screws (5) and washers (4) from
out-rigger control box (6) and bracket (1)
3.
Pull outrigger control box (6) away from
bracket (1) disconnect two electrical
connectors (7), and remove outrigger control
box.
TA706440
4-25