TM9-2330-368-14 & P
5-13. PAINTING PROCEDURE
(3) Using painting equipment apply an even
coating of primer coating without runs
or sags.
(4) Allow primer coating to dry for a mini-
mum of 1 hour before applying top
coating.
b. Top Coating.
(1) Mix two-part epoxy top coating in ac-
cordance with manufacturers instruc-
tions.
(2) Using painting equipment apply an
even coating of the top coating without
runs or sags.
(3) Allow finish coating to dry for 3 hours
before handling.
5-13