TM 9-2330-371-14&P
AIR RESERVOIR - CONTINUED
ACTION
LOCATION
ITEM
REMARKS
INSTALLATION CONTINUED
13.
Two nuts (5),
Put in and tighten using 9/16-inch wrench,
bolts (6), and
9/16-inch deep-well socket and handle.
14.
Reservoir
Nipple (16)
a. Wrap both threads two turns counter-
clockwise with teflon tape.
b. Put in and tighten using 1 1/16-inch
wrench.
Reservoir (12)
15.
Hose (17) and
Put on and tighten using 13/16-inch wrench
and nipple (16)
fitting (18)
and 1 1/16-inch wrench.
NOTE
FOLLOW-ON
MAINTENANCE:
TASK ENDS HERE
TA224283
4-107