TM 9-2330-376-14&P
Table 2-1. Operator/Crew Preventive Maintenance Checks and Services (PMCS) (Con't).
WWEEKLY
AAFTER
D-DURING
BBEFORE
INTERVAL
ITEM TO BE INSPECTED
EQUIPMENT IS NOT
PROCEDURE Check for and have repaired, filled, or
ITEM
READY/AVAILABLE IF:
adjusted as needed.
NO.
B
DA W
ELECTRICAL CONNECTION AND WIRING
3
a. Visually inspect electrical connector (1) for dam-
arcing. inspect contacts (3) for dirt, bends, burns,
or damage.
b. Visually inspect wiring harness, clips, and shells
for correct assembly and good condition.
NOTE
Perform the following checks/services
AFTER coupling trailer to towing vehicle.
LEVELING JACKS
4
Check for damage and secure mounting. Check that
aged, or inoperative
leveling jack legs extend and retract smoothly.
HANDBRAKES
5
Handbrakes fail to operate or do
With trailer coupled to towing vehicle, apply hand-
not hold wheel.
brakes. Move trailer slightly to see if handbrakes hold
WHEELS
6
One wheel damaged. One or
Check wheels for damage and wheel nuts for tight-
more wheel nuts missing.
ness and presence.
2-6