TM 9-2330-381-14
2-26.
LOADING AND UNLOADING ABLE PAYLOADS (CONT)
(g) Attach two 11-foot utility chains (33) through tiedown rings (34) on each side of platform just forward of
each payload chock (9) and connect hook to each chain (33).
(h) Pass free end of utility chains (33) through both handles of both rear payload chocks (9). Place free ends
of both utility chains (33) at center of platform.
(i) Attach load binder (35) to both utility chains (33) taking up as much slack as possible.
(j) Operate load binder (35) to tighten both utility chains (33).
2-110