TM 9-2330-381-14
(9) Remove payload tiedowns and payload chock tiedowns from payload as follows:
(a) Open load binder (35) and remove two utility chains (33) from two tiedown rings (34). Remove utility
chains (33) from two rear payload chocks (9). Move two utility chains (33) and load binder (35) out of the
way.
2-115