TM 9-2330-381-14
4-5. UNPACKING (CONT)
NOTE
Ensure intervehicular cable (electrical cable) is not connected to semitrailer.
(5) Remove four capscrews (31), lockwashers (32), and access cover (33) from deflector (21). Remove locknut
(34), lockwasher (35), and clamp loop (36) securing harness (37) to deflector (21). Discard locknut (34) and
lockwasher (35).
(6) Disconnect clearance light wire #489 (38) from harness wire #21-489 (39) and install jumper lead (40) and
adapter (41).
(7) Remove two screws (42) and lens cover (43) from clearance light (44). Locate clearance light mounting
screw (45) with externally toothed lockwasher (46) under locknut (47). Remove screw (45), locknut (47), and
lockwasher (46). Discard lockwasher (46) and locknut (47).
(8) Install screw (45), ground lead (48), lockwasher (46), and locknut (47). Ensure ground lead (48) is in contact
with bare metal and that ground lead (48) is positioned not to interfere with installation of access cover (33).
(9) Install lens cover (43) and secure with two screws (42).
(10) Connect wires on beacon warning light cable (49) to ground lead (48) and open connection on adapter (41).
(11) Install adapter (41) to clamp loop (36) and secure with lockwasher (35) and locknut (34). Install access cover
(33) and secure with four lockwashers (32) and capscrews (31).
p. Place all remaining items removed from shipping box into platform stowage compartment (1).
4-4.2 Change 1