TM 9-2330-381-14
Section II. SERVICE UPON RECEIPT
PARA. NO.
TITLE
4-5 ............................................ Unpacking
4-6 ............................................ Inspection/Servicing
4-7 ............................................ Operational Check
4-5. UNPACKING
a. Check information on all storage and shipment labels on the semitrailer; then, remove labels.
b. Remove documents from platform stowage compartment (1).
c. Cut and remove steel strapping (2) from spare tires (3), wheel chocks (4), two mounted on each side of
gooseneck, and Basic Issue Items (BII) /On Vehicle Equipment (OVE) shipping box (5).
d. Make sure that safety chains (6) of loading ramps (7) are properly connected to platform (para. 2-20); then, cut
and remove steel strapping (2) from each loading ramp.
e. Open wooden BII/OVE shipping box (5) and remove, unwrap, and inspect each item as it is unpacked. Remove
preservative materials from items using a wiping rag (item 19, appx. E).
f. Inspect items for rust, corrosion, or damage. Discard individual wrappings and cushioning materials; however,
shipping box should be retained for future use.
g. Refer to Appendix C BII and OVE listings to inventory all items removed from shipping box and/or shipped
mounted on semitrailer. Report missing items in accordance with DA PAM 738-750. Report damaged items on
DD Form 6, Packaging Improvement Report.
4-2 Change 1