TM 9-2330-381-14
3.
4.
Place W1 harness (7) into clamp (6) and secure to gooseneck component assembly (3) using locknut (5).
5.
Rotate component assembly 180 degrees and slide gooseneck component assembly (3) completely into
gooseneck (4). Secure with six screws (1) and lockwashers (2).
FOLLOW-ON MAINTENANCE
Reconnect intervehicular electrical cable and check all lights, including steering pressure indicator light (para. 2-24).
4-23.
JUNCTION BOXES
This task covers:
a. Removal
b. Inspection
c.
Installation
INITIAL SETUP
Tools
General mechanics tool kit, item 16, appx. B
Electrical repair kit, item 18, appx. B
Extension light, 24 ft, item 18, appx. B
Creeper, mechanic's, item 18, appx. B
Materials/Parts
Solvent, dry cleaning, item 26, appx. E
Lockwasher (2)
Equipment Condition
4-101