TM 9-2330-381-14
20.
Using two people, a ratchet, torque wrench, torque multiplier, and spanner socket (4), torque spanner nut (3) to
850 lb-ft 50 lb-ft (1153 Nm +67 Nm).
21.
Remove torque wrench, torque multiplier, and spanner socket (4) from spanner nut (3).
22.
Install setscrew (2) into spanner nut (3).
23.
Make sure bogie (11) is positioned in original forward position, facing toward front of semitrailer.
24.
For #1 bogie only, aline and install preformed packing (12) onto bogie (11).
25.
Remove safety pin (7), nut (8), and capscrew (9) from connecting link (10). Aline and install connecting link (10)
onto linkage attaching point on bogie (11). Secure in place by installing capscrew (9) and nut (8).
26.
Using a torque wrench, torque nut (8) to 205 lb-ft (278 Nm) and then continue to tighten nut (8) until first available
slot is aligned with hole and safety pin (7) can be installed.
27.
Reconnect two hydraulic hoses (14) to suspension isolation valve (1).
28.
Secure two hydraulic hoses (14) with block clamp (13) as follows:
a. For bogies #1, #2, #3, and #5, install sections of block clamp (13) over both hydraulic hoses (14) and secure
with capscrew (15).
Change 1 4-171