TM 9-2330-381-14
4-41. SUSPENSION CYLINDER
This task covers:
a. Removal
b. Inspection
c. Installation
INITIAL SETUP
Tools
Isolation valve handle extension, item 1, appx. B
Suspension mandrel, item 6, appx. B
General mechanics tool kit, item 16, appx. B
The following tools can be found in common tool kit no. 2, item 18, appx. B:
Drain pan, 4 gl capacity
Sledge hammer, 12 lb
Measuring tape, 50 ft
Jack, floor, hydraulic, 10 ton
Goggles, Industrial
Gloves, chemical and oil protective
Extension light, 24 ft
Lubricating handgun
Retaining ring pliers, external
Degreaser tank, 20 gl capacity
Materials/ Parts
Cleaning compound solvent, item 25, appx. E
Antiseize compound, item 3, appx. E
Strap, electrical tiedown, item 27, appx. E
Abrasive crocus cloth, item 6, appx. E
Ring spacer assembly (4)
Lockwasher (6)
Locknut (2)
Locknut
Locknut
Locknut
Personnel Required:
2
Equipment Condition
General Safety Instructions
WARNING
Hydraulic fluid may be hot if system has been in operation. Allow time to cool
before performing maintenance or injury to personnel may result.
4-174