TM 9-2330-381-14
19.
Remove hitch pin (4) from winch cable pulley clamp (5) and move pulley clamp (5) to stow position at end of davit
(6). Install hitch pin (4) and secure.
20.
Remove caps/plugs and reconnect two nonmetallic hoses (3) to steering cylinder (1).
FOLLOW-ON MAINTENANCE
1.
2.
3.
4.
5.
4-56.
GOOSENECK STEPS
This task covers:
a. Removal
c. Assembly
b. Disassembly
d. Installation
INITIAL SETUP
Tools
General mechanics tool kit, item 16, appx. B
Materials/Parts
Cotter pin
Cotter pin (2)
Locknut (2)
Locknut (6
Locknut (2)
Locknut (2)
Equipment Condition
General Safety Instructions
WARNING
When on top of gooseneck and removing or installing gooseneck steps, always
hold onto semitrailer with one hand or injury to personnel may result.
4-283