TM 9-2330-381-14
8.
Remove caps/plugs. Apply petroleum jelly to preformed packing (82). Apply pipe sealant to all male threads.
Install preformed packing (82), tube nipple (81), and nut (80).
9.
Remove caps/plugs. Apply petroleum jelly to preformed packing (78). Apply pipe sealant to all male threads.
Install tube nipple (79), preformed packing (78), nut (77), tee (76), reducer (75), reducer (74), coupling nut (73),
and tube (72).
10.
Remove caps/plugs. Apply petroleum jelly to preformed packing (71). Apply pipe sealant to all male threads.
Install preformed packing (71), nut (70), tube nipple (69), and reducer (68).
11.
Remove caps/plugs. Apply pipe sealant to all male threads. Install tee (67), reducer (66), coupling nut (65), and
three tubes (64, 63, and 62).
12.
Install two block clamps (61) and secure with four screws (60).
13.
Remove caps/plugs. Apply petroleum jelly to two preformed packings (56) and two preformed packings (52).
Apply pipe sealant to all male threads. Just aft of each bogie, curbside and streetside, install T bracket (59) and
secure with three washers (58) and self-locking nuts (57). Install suspension isolation valve assembly (53), two
preformed packings (56), nipples (55), and nuts (54). Install two preformed packings (52) and straight adapters
(51).
4-459