TM 9-2330-383-14&P
REPAIR
a. If defective, replace preformed packing in gladhands.
b. Replace other defective parts as required.
c. Refer to appendix G (figure G-1) for nonmetallic tube sizes and materials.
d. Refer to TM 9-4940-468-14 (para. 2-10 and 2-11) for fabricating hoses and
tubes.
INSTALLATION
NOTE
To install air lines on new trailers with serial numbers 2001 and up,
perform step a. To install air lines on old trailers with serial
numbers 2000 and below, perform step b.
a. To install air lines on new trailers with serial numbers 2001 and up, proceed
as follows:
NOTE
Apply anti-seize tape to all pipe threads.
(1)
Install hoses and tubes. Refer to appropriate installation procedures.
(2)
Install looms and tiewraps, as required.
(3)
Install two nuts (5) and clamps (6).
(4)
Install nine nuts (3) and clamps (4).
(5)
Install five nuts (1) and clamps (2).
(6)
Connect hoses and tubes
(7)
Connect trailer to towing vehicle, allow 2 minutes for air system to
fully charge, and check for leaks.
b. To install air lines on old trailers with serial numbers 2000 and below,
proceed as follows:
NOTE
Apply anti-seize tape to all pipe threads.
(1)
Install hoses and tubes. Refer to appropriate installation procedures.
(2)
Install looms and tiewraps, as required.
(3)
Change 1