TM 9-2330-383-14&P
4-28. TIE RODS (CONT)
d. Install long tie rod (2) into curbside and streetside assembly arms (7).
e. Secure ends with nuts (13). Torque to 125 lb ft, tighten as required to aline
f. Install clamps (4) on each end of short tie rod (1) (do not tighten).
g. Install tie rod ends (7) onto short tie rod (1).
h. Position clamps (4) and tighten nuts (3).
i. Install short tie rod (1) into streetside assembly arm (7) and towbar pivot
(8).
j. Secure ends with nuts (6). Torque to 125 lb ft, tighten as required to aline
END OF TASK
4-29. STEERING ADJUSTMENT
This task covers: a. Long Tie Rod Adjustment
c. Four Wheel Alinement
b. Short Tie Rod Adjustment
d. Steering Stop Adjustment
INITIAL SETUP
Tools
Personnel Required: 2
General mechanics tool kit
Tape measure, 50-foot
Torque wrench
NOTE
Inflate air bags to normal suspension height to avoid tracking error.
After front end suspension or tie rod installation, aline front axle to
ensure proper tracking of trailer and to avoid excessive tire wear.
LONG TIE ROD ADJUSTMENT
a. Center tow bar assembly (1) by alining the alinement grooves (2). Secure by
rotating lock pin handle (3) counterclockwise and inserting hitch pin (4).
4-64