TM 9-2330-388-14
Table 4-1. Unit Preventive Maintenance Checks and Services
Q-Quarterly
S - Semiannually
A - Annually
B - Biennially
H - Hours
INTERVAL
ITEM TO BE INSPECTED
ITEM
PROCEDURE: Check for and have repaired,
NO
Q
S
A
B
H
filled, adjusted as needed
Perform operator/crew PMCS prior to or in conjunction with unit PMCS if:
a. There is a delay between daily operation of semitrailer and unit PMCS.
b. Regular operator Is not assisting/participating.
1
Tank.
Check inside of tank thoroughly:
a. Check manhole cover for rust or debris. If rust or debris are found, for cleaning,
b. Check tank for rust at intersections where brackets are welded to tank. If rust is
found, notify unit medical personnel for re-certification.
c.
Check condition of paint. Notify direct support maintenance of any damage found.
2
Electrical System.
a. Check chassis electrical harness connections for security and condition. Check
harness for worn or frayed insulation.
b. Inspect intervehicular cable receptacle for damage or corrosion.
3
Bogie Assembly.
a. Tighten loose cross tube U-bolts.
b. Check spring leaves, clips, and spring U-bolts.
4
Towing Connections.
Inspect condition of kingpin for wear. Kingpin should be replaced when any of the
following conditions exist:
a. Wear of 1 /1 6-inch over 1/4 of the circumference of the kingpin. This would be a
condition of uneven wear on one or more sides of the kingpin wear surface.
4-4