Custom Search
|
|
|
||
TM 9-2330-394-13&P
FRAME RAIL (LMTVT) REPLACEMENT - Continued
0115 00
OPERATIONAL CHECK
1.
Install push-pull/air supply valve (WP 0062 00, Installation).
2.
Install leaf springs (WP 0100 00, Installation).
3.
Install stabilizer mounting bracket (WP 0092 00, Installation).
4.
Install stabilizer bar (WP 0091 00, Installation).
5.
Install tongue assembly (WP 0113 00, Installation).
6.
Install subframe (WP 0111 00, Installation).
7.
Install electrical cable assembly (WP 0051 00, Installation).
END OF WORK PACKAGE
0115 00-8
|
||