CENTER CROSSMEMBER REPLACEMENT
THIS WORK PACKAGE COVERS:
Removal, MTVT; Installation, MTVT; Operational Check, MTVT; Removal, LMTVT; Installation,
LMTVT; Operational Check, LMTVT
INITIAL SETUP:
Maintenance Level
Materials/Parts (Cont)
Field
Nut, Self-Locking (24) (LMTVT)
(Item 35, WP 0181 00)
Tools and Special Tools
Ties, Cable, Plastic (Item 37,
Tool Kit, Genl Mech (Item 37, WP 0178 00)
Socket Set, Impact (Item 28, WP 0178 00)
Wrench Set, Socket (Item 46, WP 0178 00)
Personnel Required
Wrench Set, Socket (Item 47, WP 0178 00)
Two
Goggles, Industrial (Item 8, WP 0178 00)
Equipment Conditions
Wrench, Impact, Electric (Item 42, WP 0178 00)
Frame rail removed (from side being
Wrench, Torque, 50-250 lb-ft (Item 50,
worked) (MTVT) (WP 0116 00).
Axle bogie shaft removed (opposite side
Wrench, Torque, 0-600 lb-ft (Item 52,
being worked) (MTVT) (WP 0122
ABS ECU valve removed (MTVT)
Trestle, Motor Vehicle Maintenance (2)
(Item 38, WP 0178 00)
ABS relay valve removed
Materials/Parts
ABS control assembly bracket removed
Bolt (8) (LMTVT) (Item 26,
Leaf spring removed (from side being
Bolt (8) (LMTVT) (Item 29,
worked) (LMTVT) (WP 0100 00).
Cargo bed removed (WP 0103 00).
Bolt (12) (LMTVT) (Item 21,
WARNING
Wear appropriate eye protection when working under trailer due to the
possibility of falling debris. Failure to comply may result in injury to
personnel.