TM 9-2350-222-10-2
CAUTION
OPERATE WINCH (PERFORM DIRECT WINCHING) - Continued
Cable (B) must be kept tight and coils (H) dose together
when rewinding cable on winch (F).
6. Move WINCH CONTROL lever (A) up to reel in cable (B) and load
(C).
7. Traverse turret (page 2-502) back and forth to keep winch (F) in line
with cable (B). Maintain tight and even coils (H).
8. Move WINCH CONTROL lever (A) down to release tension on cable
(B).
9. Remove lifting hook (D) from load (C).
TA132415
2-275