TM 9-2350-222-10-2
OPERATE BOOM (PERFORM HOISTING) - Continued
16. Move WINC H CONTROL lever (B) down to pay out enough cable
(C) to reach load (N).
17. Connect snatch block (D) to load (N).
18. Connect rope (P) to load (N).
19. Hold rope (P) to prevent load (N) from turning.
WARNING
Keep all personnel clear of winch cable during hoisting
operation. All personnel must be at least the length of
cable away from vehicle and load. Serious injury could
result if winch malfunctions or cable breaks.
CAUTION
Lifting capacity with two-part line is 35,000 pounds.
NOTE
Hoisting speed with two-part line will be half the speed
of single line operation.
TA252757
Change 1
2-301