TM 9-2350-277-10
ASSEMBLY AND PREPARATION FOR USE MORTAR FIRE CONTROL
0086 01
SYSTEM (MFCS), M95 ONLY -- Continued
NOTE
Step 16 applies to installation of gunner's display (GD) on bipod.
NOTE
Do not press TEST button on gunner's display during firing operations. Complete system
re-initialization will be required.
NOTE
If GD is mounted on back wall, see GD alternate location insert.
16. Connect power/data cable 3W5 (38) to J1 connector (37) on GD (36).
0086 01-5
Change 4