TM 9-2590-209-14&P
ORGANIZATIONAL MAINTENANCE LUBRICATION GUIDE
BULLDOZER, EARTH MOVING: TANK MOUNTING M9
Intervals and the related manhour times are based on
Park vehicle on level ground to check oil levels.
normal operation. The manhour time specified is the
time required to perform all services prescribed for a
Clean fittings before and after lubricating with a dry, lint-
particular interval. The interval shall be changed to
free cloth.
compensate for abnormal operation and severe
operating conditions or contaminated lubricants. The
Lubricate points indicated by dotted arrow shafts on both
interval may be extended during periods of low level
sides of vehicle.
activity, commensurate with adequate preservation
precautions.
Lubricate all items found contaminated after fording or
washing.
Figure 4-1. Organizational maintenance lubrication guide (sheet 1 of 2).
4-2