TM 9-2590-209-14&P
(2) Install manifold cover (7,fig 425) and
b. Installation.
secure with 12 screws (6) and gasket (8) and
(3) Install cover (3) and gasket (4) to guard,
on shift lever bracket and secure with screw (12),
lockwasher (13) and nut (14).
(2) Install three screws (10) and washers (11)
4-88.
Blade Control Assembly.
securing bracket assembly (7) to shift lever bracket.
a. Removal.
(3) Install screw (8) and lockwasher (9)
securing bracket assembly (7) to shift lever bracket.
assembly (2) to control lever (23), and remove rod
(4) Position indicator (6) on bracket assembly
assembly.
(7), and secure with two screws (5).
(5) Position lever (4) on indicator (6), and
(2), and washer (3) securing lever control (4), and
secure with screw (1), lockwasher (2), and washer (3).
remove lever control.
(6) Install rod assembly (2, fig 4-23) to control
(3) Remove two screws (5) securing indicator
lever (23), and secure with nut (1).
(6) to bracket assembly (7), and remove indicator.
c. Adjustment.
(4) Remove screw (8) and lockwasher (9)
securing bracket assembly (7) to shift lever bracket.
(1) Bend control lever shaft to provide 2-5/8
inches clearance between shift lever handle and
(5) Remove three screws (10) and washers
bulldozer control lever.
(11) securing bracket assembly (7) to shift lever bracket.
(2) Move control lever and insure that it shifts
(6) Remove screw (12), lockwasher (13), and
freely from one position to the other.
nut (14) securing bracket assembly (7) to shift lever
bracket, and remove bracket assembly.
4-56