Figure 3-41. Removal or installation ,of moldboard assembly (sheet 4 of 4).
f. Remove straps or bands securing cylinder rams
k. Remove hoist chains, check operation of
in raised position.
Activate hydraulic system and
moldboard and hydraulic system by operating
position rams in push beam as u shown in view.
moldboard through all positions. If binding of linkages is
g. Install pivot pins and secure a
shown in
figure
observed, check for proper installation of pivot pin.
Place moldboard in stow position and check locking
action of carrying hooks. Adjust as necessary (figure 3-
moldboard of ground (3 to 4 inches). Apply lifting power
3-98. Replacement of Moldboard Cutting Edge
to hoist to tilt moldboard toward a vertical position.
i. Position and connect inner tilt arm as shown in
(Blade).
j. Position and connect outer tilt arms as shown in
for instructions covering the removal and installation of
the moldboard cutting edge.
3-57