TM 9-4110-246-14
TO 40R7-5-10-1
OPERATOR/CREW PREVENTIVE MAINTENANCE CHECKS AND SERVICES
B BEFORE OPERATION
D DURING OPERATION
W WEEKLY
M MONTHLY
ITEM TO BE INSPECTED
EQUIPMENT IS NOT
READY/AVAILABLE IF:
ITEM
INTERVAL
PROCEDURE: CHECK FOR AND HAVE REPAIRED,
NO.
FILLED, OR ADJUSTED AS NEEDED
B
D
A
W
M
28
Trims are warped,
and Side Trims . With
damaged, or
refrigeration equipment
deteriorated.
removed, inspect top, bottom
and side trims on both
29
Floor Racks . Inspect floor
damage, or loose slots.
30
Floor Racks . Remove floor racks
from refrigerator . Scrub with
soap and water solution . Rinse
and reinstall racks after
scrubbing.
2-15